Mitsubishi Power completes renovation of Otake geothermal power station in Japan | Think GeoEnergy

Otake geothermal power plant, Oita Pref., Japan (source: Mitsubishi Power)

Mitsubishi Power has completed its renovation of the Otake geothermal power plant in Oita Prefecture, Japan. The company worked under an EPC contract, together with Mitsubishi Power Industries and Mitsubishi Electric installing a new turbine increasing the plants capacity to 14.5 MW.

Mitsubishi Power, a major subsidiary of Mitsubishi Heavy Industries (MHI) Group, has today announced having completed its renovation of the Otake Geothermal Power Station (Kokonoe-machi, Oita Prefecture) operated by Kyushu Electric Power Company. Commercial operation of the renovated facility began in October 2020. The stable electric power supply generated by the highly efficient and reliable steam turbine installed as part of this renovation project will curb CO2 emissions, and contribute to a decarbonized economy.

This renovation project was conducted under an engineering, procurement and construction (EPC) contract by a joint venture comprising Mitsubishi Power, which supplied the steam

Read More

Mitsubishi Power Completes Renovation of Generating Facilities at Otake Geothermal Power Station

YOKOHAMA, Japan, Oct 5, 2020 – (JCN Newswire) – Mitsubishi Power, a major subsidiary of Mitsubishi Heavy Industries (MHI) Group, has completed its renovation of the Otake Geothermal Power Station (Kokonoe-machi, Oita Prefecture) operated by Kyushu Electric Power Company. Commercial operation of the renovated facility began in October 2020. The stable electric power supply generated by the highly efficient and reliable steam turbine installed as part of this renovation project will curb CO2 emissions, and contribute to a decarbonized economy.

This renovation project was conducted under an engineering, procurement and construction (EPC) contract by a joint venture comprising Mitsubishi Power, which supplied the steam turbine, Mitsubishi Power Industries Co., Ltd., which handled the supply and installation of auxiliary equipment, and Mitsubishi Electric Corporation, which supplied the generator and electrical facilities.

The power generation system utilizes a “double flash and dual pressure” method, the first of its type in Japan. This

Read More

Fairbanks Museum gets solar panels, EV charging station, with more improvements coming

It seems written in the stars that Vermont’s planetarium would go solar.



a room filled with furniture and a fire place: Due to the closure of schools because of COVID-19, Fairbanks Museum and Planetarium has ramped up online classes for students and can be toured virtually through vermontartonline.org.


© Courtesy: VERMONTARTONLINE.ORG
Due to the closure of schools because of COVID-19, Fairbanks Museum and Planetarium has ramped up online classes for students and can be toured virtually through vermontartonline.org.

The Fairbanks Museum & Planetarium in St. Johnsbury received a shipment of solar panels from Sun Common for a solar canopy to be erected in the parking lot.

The museum will also get an electric vehicle charging station. For Burlington museum goers, the trip from ECHO Leahy Center in downtown Burlington to the Fairbanks Museum & Planetarium is 76.1 miles, roughly an hour and a half drive.

In a social media post, the museum said the effort is “part of our ongoing commitment to lightening the Museum’s environmental footprint.”

Many museums have struggled during the closure due to the pandemic and have only recently begun to allow visitors

Read More

Space Station bathroom renovation launching on next cargo supply run

It’s a home makeover but 200 miles above Earth: The next resupply delivery mission to the International Space Station will include a new re-designed commode for the astronauts.

A cargo re-supply launch is scheduled to liftoff on a Northrop Grumman Antares rocket Sept. 29 from NASA’s Wallops Island Flight Facility carrying supplies for the astronauts, research, hardware and a marketing experiment for the makeup company Estee Lauder.

[TRENDING: Gang feud leaves 3-year-old dead | Man steals cat blood from clinic | How can I tell difference between flu and COVID-19?]

Loaded up among nearly 8,000 pounds of supplies, the Northrop Grumman’s Cygnus cargo spacecraft will also deliver a new “Universal Waste Management System,” also known as a space toilet, to the floating laboratory in space and home to astronauts 365 days a year.

The system actually has two important purposes on the ISS. Outside the bathroom needs, it also

Read More

Renovation will help protect Springdale firefighters at Station No. 4

SPRINGDALE — The City Council has answered the call to protect the firefighters in the Fire Department.

The council on Tuesday night unanimously approved a $7,800 contract with Crafton Tull for architectural services to renovate Fire Station No. 4 on Elm Springs Road.

“We’re trying to help with the decontamination of our individuals,” Fire Chief Mike Irwin told the council. “And that’s become very different with our pandemic calls.”

Even without the threat of covid-19, firefighters’ exposure to smoke and burning of hazardous chemicals at fire sites and even the diesel fumes from engines and ambulances has been linked to cancer, according to the National Fire Protection Association.

The renovated space at Station No. 4 will include showers, washing machines and a new weight room to help protect its firefighters and get them ready more quickly for the next call, Irwin said.

“This will help improve response times for our

Read More